Renovation and replacement of TCL elevators and escalators: an improvement for everyday life

Guide by station: alternatives and access solutions during construction

Tip to anticipate your journeys:

via votre Téléphone Check equipment operating status, in real time via accessibility alerts or on the TCL app (Go to Menu and click on "Equipment accessibility information")

Ascenseur

SYTRAL Mobilités pursues a proactive policy of maintaining and renewing its infrastructure and equipment. The aim is to offer the best possible travel conditions and comfort to TCL network users. A vast action plan has been deployed to renovate and modernize the network's escalators and elevators.

Ascenseur

The forthcoming work will take place in two phases: 

  • From March 2026 to the end of 2027, with the replacement of 24 elevators in 12 metro stations: Monplaisir-Lumière (metro D), Bellecour (metro A and D), Gorge de Loup (metro D), Grange Blanche (metro D), Parilly (metro D), Vieux Lyon (metro D), Guillotière (metro D), Hôtel de Ville-Louis Pradel (metro A and C), Garibaldi (metro D), Sans Souci (metro D), Saxe-Gambetta (metro B and D), Laennec (metro D).
  • Between 2027 and 2029, with the replacement of 23 escalators: Parilly (metro D), Laennec (metro D), Grange Blanche (metro D), Montplaisir-Lumière (metro D), Sans Souci (metro D), Garibaldi (metro D), Guillotière (metro D), Bellecour (metro lines A and D), Gorge de Loup (metro line D), Jean Jaurès (metro line B), Debourg (metro line B), Gerland (metro line B).